Hardware initialization and configuration

Based on the selected server platform (HPE ProLiant, HPE Edgeline, or HPE Synergy), perform the hardware initialization and configuration in the following order:

Procedure
  1. Physical cabling of the various components using the Port map.
  2. Configuration of ILO-OOBM VLAN in customer infrastructure switch
  3. Configure CAN and OAM VLAN in customer infrastructure switch
  4. Based on the selected hardware switch, perform manual switch (Management and Data) configurations.
  5. If you opted for HPE 3PAR as the storage, perform the configuration as per the procedure in Expand HPE 3PAR disk enclosure.: