Verifying the installation
WARNING! A 12508E has one power switch, and a 12518E has two power switches. Make sure you have turned off the power before checking the installation to avoid bodily injury and switch damage. | ||
After the installation is completed, verify the installation against the following list. Be sure that all check results are positive.
Table 8: Installation checklist
Item | Result | Remarks | |
---|---|---|---|
Yes | No | ||
The grounding cable is correctly grounded. | |||
Fan trays are correctly installed and make close contact with the backplane. | |||
Power modules are correctly installed and have close contact with the frames. | |||
The power switch is off (the power switch is at the OFF position). | |||
Power cords are correctly connected. | |||
MPUs are correctly installed and have close contact with the backplane. | |||
LPUs are correctly installed and have close contact with the backplane. | |||
Switching fabric modules are correctly installed and have close contact with the backplane. |