Verifying the installation


[WARNING: ]

WARNING!

A 12508E has one power switch, and a 12518E has two power switches. Make sure you have turned off the power before checking the installation to avoid bodily injury and switch damage.


After the installation is completed, verify the installation against the following list. Be sure that all check results are positive.

Table 8: Installation checklist

Item

Result

Remarks

Yes

No

The grounding cable is correctly grounded.

Fan trays are correctly installed and make close contact with the backplane.

Power modules are correctly installed and have close contact with the frames.

The power switch is off (the power switch is at the OFF position).

Power cords are correctly connected.

MPUs are correctly installed and have close contact with the backplane.

LPUs are correctly installed and have close contact with the backplane.

Switching fabric modules are correctly installed and have close contact with the backplane.