Shutting down RHOCP
Prerequisites
Before shutting down the cluster, see Changing administration and maintenance of cluster, from current Bastion host (NPS Toolkit VM) to separate Bastion host.
Procedure
- Back up switch configuration data.
- Back up etcd data.
- Back up projects and PVC yaml files of HPE Nimble storage.
- Check certificates expiry date of a cluster.
- Regenerate certificates, if required or skip this step.
- Create temporary service admin for cluster.
- Shut down the worker nodes, then shutdown the master node.
- Shut down the storage node, registry VM/machine (applicable only for restricted network/offline mode of installation), DHCP server, load balancer, and DNS.