OpenFlow configuration task list

Tasks at a glance

(Required.) Configure an OpenFlow instance:

  1. (Required.) Creating an OpenFlow instance

  2. (Required.) Configuring an OpenFlow instance:

  3. (Required.) Activating or reactivating an OpenFlow instance

(Required.) Configure controllers for an OpenFlow switch:

(Optional.) Setting OpenFlow timers

(Optional.) Configuring an OpenFlow instance to support dynamic MAC addresses

(Optional.) Enabling packet loss prevention for OpenFlow forwarding

(Optional.) Creating a highest-priority flow entry for dropping slow protocol packets

(Optional.) Enabling an OpenFlow instance to perform QinQ tagging for double-tagged packets passing an extensibility flow table

(Optional.) Setting a DSCP value for OpenFlow packets

(Optional.) Allowing link aggregation member ports to be in the deployed flow tables

(Optional.) Enabling OpenFlow connection backup

(Optional.) Shutting down an interface by OpenFlow

(Optional.) Enabling loop guard for an OpenFlow instance