Smart Link tasks at a glance

To configure Smart Link, perform the following tasks:

  1. Configuring a Smart Link device

    1. Configuring protected VLANs for a smart link group

    2. Configuring member ports for a smart link group

    3. (Optional.) Configuring a preemption mode for a smart link group

    4. (Optional.) Enabling the sending of flush messages

    5. (Optional.) Configuring collaboration between Smart Link and Track

  2. Enabling an associated device to receive flush messages